Vergeer Dairy Farm

DeLaval milking robot room

Vergeer Dairy Farm

This twin project at the Vergeer dairy farm in Overschild demonstrates how Combiboard Zeta 175 mm performs in an active dairy farm setting. Bouwbedrijf MT installed the roofing at a height of 1.4 m around the DeLaval milking robots, which are designed to withstand the daily conditions in the barn.

Request a quote

  • ApplicationMilking robot room
  • ProductZeta
  • LocationOverschild,Netherlands
B.W. - Combiboard

Phase 1

Phase 2

Combiboard Zeta

Zeta wall panels are ideal for situations where stability, hygiene and fire safety are of great importance. The individual profiles are filled with concrete after installation. The combination of a smooth plastic top layer and filling with concrete ensures maximum stability and hygiene.

More info

Would you like more information about milking robot rooms?

Are you planning to build a milking robot room and do you consider Combiboard’s plastic wall systems a suitable choice? Then ask us for a free quote now or contact us. We’d be happy to tell you about the possibilities!

Contact usRequest a quote